When we use a regression line to compare two analytical methods, e.g.
a new, cheap method and an expensive reference method,
we plot the results obtained with the new method against the results (on
the same samples!) obtained with the other method. If the two
methods give the same result, the best line will be:
y = x
Which method should be plotted on the x axis?